Launching or renovating a restaurant? A full kitchen installation can feel like a major project — but with the right partner and process it becomes predictable, fast, and low-risk. This guide walks you through Kookmate’s proven fast-turnaround installation approach: what’s included, realistic timelines, costs, permit & utility checkpoints, the step-by-step process, and how to order today so your kitchen is ready sooner.
Why choose a full installation (not piecemeal)?
-
Single-point accountability: one vendor handles design, equipment supply, installation and commissioning.
-
Faster time to revenue: integrated scheduling and prefabrication reduce delays.
-
Fewer mistakes: coordinated utility layouts (gas, electrical, water) prevent rework.
-
Consistent quality & compliance: permit-ready drawings and certified installers reduce inspection risk.
-
Turnkey training & handover: your team receives hands-on training for consistent output from day one.
What a full restaurant kitchen installation from Kookmate includes
-
Initial consultation & free site survey (measurements, utilities, local code notes).
-
CAD layout & equipment schedule (plan showing cookline, prep, cold rooms, dishwash area, service pass).
-
Permit-ready drawings and support for local health/fire/ventilation authorities.
-
Supply of equipment (ovens, ranges, fryers, steamers, refrigeration, ventilation/hoods, sinks, benches).
-
Fabrication & installation (stainless steel counters, shelving, ducting, hoods, grease traps).
-
Gas & electrical hook-up by certified contractors (pressure testing & earthing).
-
Hood balancing & make-up air to manufacturer specs and code.
-
Commissioning & performance testing (temperature checks, energy draw, hood airflow).
-
Operator training (SOPs, first-week support, basic troubleshooting).
-
Warranty handover & preventive maintenance options.
Typical fast-turnaround timelines (realistic expectations)
| Project Size | Typical Scope | Fast Turnaround Timeline |
|---|---|---|
| Small (QSR / café) | Single cookline, reach-in fridges, undercounter dishwasher | 7–14 days (site prep permitting) |
| Medium (Full-service, 50–120 covers) | Multi-station cookline, walk-in cooler, larger hood | 3–5 weeks |
| Large (Hotel / Banquet / Central kitchen) | Multiple cooklines, blast chiller, large walk-in cold rooms | 6–12+ weeks (depends on civil works & permits) |
Note: timelines assume timely permit approvals and that civil works (flooring, drainage) are either minimal or completed in advance. Kookmate offers a fast-track option that prioritizes fabrication and local permitting to shorten lead times where possible.
Fast-Track Installation Process — step by step
-
Book a Free Site Survey (Day 0–2)
-
We measure, confirm utilities, and capture site photos. Receive a Concept Quote within 48 hours.
-
-
Design & Approval (Day 3–7)
-
Two CAD layout options delivered. You approve one and Kookmate finalizes equipment spec & permit pack.
-
-
Procurement & Prefab (Day 8–14)
-
Equipment ordered; stainless fabrication and ductwork prefabricated off-site to reduce on-site hours.
-
-
Site Prep (concurrent)
-
Client completes civil works or Kookmate coordinates (if included): flooring, drains, gas line core works.
-
-
Installation & Hookups (Day 15–21 for small; extended for bigger projects)
-
Certified crews install, balance hoods, connect gas/electrical, test systems.
-
-
Commissioning & Training (Day of completion + 1–2 days)
-
Performance tests, staff training, first-service support.
-
-
Handover & Warranty
-
As-built drawings, manuals, warranty document and preventive maintenance plan delivered.
-
Major cost drivers:
-
Scope of equipment (combi ovens, blast chillers, walk-ins).
-
Hood & ducting complexity and make-up air needs.
-
Local permit fees and special code requirements.
-
On-site civil works (flooring, drainage, plumbing relocation).
-
Gas vs electric utilities and whether three-phase power is needed.
-
Custom stainless fabrication (benches, pass counters, shelving).
For a precise quote, request a free site survey. Kookmate provides line-item quotes so you see exactly what you’re paying for.
How we shave days off typical installations
-
Prefabrication: duct segments and stainless benches built off-site.
-
Standardized packages: pre-engineered cooklines reduce design time.
-
Permit support: we provide permit-ready drawings and coordinate submissions.
-
Local installer network: certified trades in major cities reduce travel & scheduling delays.
-
Parallel workflows: procurement, electrical prep and fabrication occur simultaneously where possible.
Compliance & safety checklist (must-haves before installation)
-
Verified gas supply and regulator specification.
-
Electrical supply (single or three-phase) with dedicated breakers and earthing.
-
Approved hood and make-up air calculations for intended equipment.
-
Floor gradient and drainage to local plumbing code.
-
Fire suppression and extinguishers as per local authority.
-
Food-safety-approved finishes (304 stainless where needed).
-
Local licenses or permits for construction and food operations.
What’s included in the warranty & aftercare
-
Manufacturer warranty: parts & labor (typical 12–24 months depending on equipment).
-
Kookmate installation warranty: workmanship guarantee on installation.
-
Optional PM contracts: scheduled preventive maintenance visits (monthly/quarterly).
-
Priority support: for customers who opt into maintenance bundles.
Case Study — Fast Turnaround QSR (example)
Client: QuickBowl — 1 outlet (QSR) in Mumbai
Goal: Convert empty retail shell to fully functioning cloud/QSR kitchen in 12 days.
Scope: 1-line cookline, hood & makeup air, reach-in fridge, undercounter dishwasher, POS + KDS.
Result: Site survey to first service in 12 days. First-month sales exceeded forecast by 18% due to optimal layout and trained staff. Client reported reduced labor per order by 20% in month one.
Ordering checklist — what we need from you to start
-
Site address & basic photos/floor dimensions.
-
Desired opening date / launch window.
-
Menu outline (primary items & peak volumes).
-
Utilities availability: gas type (LPG/Natural), electrical phase & amps, water source.
-
Any local permit restrictions or special requirements.
-
Budget band (helps us propose optimal packages).
Frequently Asked Questions (FAQs)
Q: How quickly can you start work?
A: Kookmate can schedule a site survey within 48 hours in most metro areas. Fast-track installations can begin procurement within a week of approval.
Q: Will you handle permits?
A: Yes — we provide permit-ready drawings and can coordinate submissions. Permit approval time varies by local authority.
Q: Do you offer phased installation to keep current kitchen running?
A: Yes — we plan phased installs to minimize downtime for existing operations.
Q: Can you integrate my existing equipment?
A: We can evaluate and integrate suitable existing units into the new layout to save cost.
Q: What about financing?
A: Kookmate partners with financing providers; leasing and staged payment options are available.
Call to action — start your fast installation today
Ready to get a full restaurant kitchen installed quickly and reliably? Book your free site survey and concept quote today.
Website: www.kookmate.com
Phone / WhatsApp: 7299020000
(Ask for “Fast Turnaround Installation” when you call.)
Suggested internal links & SEO keywords
Internal links to include:
-
Turnkey Kitchen Packages (pricing page)
-
Kitchen Layout Design Services (CAD examples)
-
Equipment Catalog (ovens, steamers, refrigeration)
-
Preventive Maintenance Plans (aftercare page)
Top SEO keywords to use in headings, alt text & meta tags:
-
full restaurant kitchen installation
-
turnkey kitchen installation service
-
fast kitchen installation near me
-
commercial kitchen installation cost
-
restaurant kitchen installation company
-
kitchen installation and commissioning
-
kitchen layout design and installation
-
Kookmate kitchen installation